DDG Group specialises in delivering comprehensive groundwork, construction, and infrastructure solutions across commercial, industrial, and large-scale residential projects in the UK. Our commitment to excellence, safety, and sustainability ensures that each project is executed precisely and professionally.

Frankfurt Data Centre

DDG Group completed a high-profile project in Frankfurt, Germany, providing a comprehensive workforce and all necessary plant to meet the project’s demanding requirements. Our team supplied skilled labourers, experienced groundworkers, and foremen, ensuring each stage of the project was carried out with precision and efficiency.
A key element of this project’s success was our swift onboarding process, which allowed us to deploy a fully compliant team in a tight time frame. This streamlined approach enabled us to meet strict project timelines while maintaining rigorous quality and safety standards throughout.
DDG Group delivered a seamless, reliable service through effective planning and our team’s expertise, reinforcing our reputation for excellence in international groundworks and construction.

The Amsterdam’s AMS 13/14 Data Center project involved supplying skilled labour and specialised equipment to deliver high-quality infrastructure for a leading data centre facility. Our team executed various essential site services, including kerbing, edging, road formation, drainage installation, concrete base construction, and power-floated flooring, to meet the rigorous standards required for data centre operations.
Key elements included deep excavation to prepare the site for utility installations, precise kerbing and road formation for site accessibility, and tarmacking for durable road surfaces. The concrete bases and power-floated flooring were meticulously completed to ensure a smooth, strong, and reliable foundation for heavy data centre equipment, aligning with the project’s high performance and durability demands. This project enhances Amsterdam’s data infrastructure, supporting future growth and digital connectivity.

Demolition & Reconstruction:
We demolished the entire library, preserving just three walls and constructing a new two-storey building. This new structure was designed to accommodate a range of community-focused services and activities, ensuring the space is versatile and future-proof.

New Facilities & Spaces:
The rebuilt library now features several new spaces aimed at serving the community, including Event Gallery, Café, Maker Space, Business Lounge, Community Space, and Outdoor Classrooms

Outcome:
The investment in the newly developed West Wickham Library has revitalised the building and expanded its functionality and appeal. By creating a versatile, multi-use facility, the project has significantly increased the library’s usage and ensured long-term sustainability. The new library now serves as a dynamic hub for community interaction, learning, and business, aligning with Bromley Council’s vision to enhance public and community engagement.

Project Overview:
The Braintree High Street renovation was a collaborative effort between DDG Group and Limegate. Its goal was to revitalise and enhance the street to provide a safer, more accessible, and aesthetically pleasing environment for residents and visitors. The project included extensive hard landscaping, the installation of speed-protective bollards, and the application of resin-bound surfacing. This venture reflects a commitment to sustainable design, improved accessibility, and local aesthetic appeal.

Project Impact:
This joint venture has transformed Braintree High Street into a more attractive and accessible space. It supports local businesses by enhancing foot traffic and providing an inviting atmosphere. The upgraded infrastructure promises longevity, easy maintenance, and greater public enjoyment for years to come.

The Sittingbourne Rugby Club project is an exciting, multi-phase development to establish a top-tier sports facility and community hub. Currently in Phase 1 (Cut and Fill), the project involves extensive groundwork preparation to ensure a solid foundation for the following facilities. In this initial stage, we are grading and levelling the site, readying it for further construction by creating a balanced earthwork profile that optimises land stability.
Upon completion of Phase 1, the project will move into a comprehensive Turn-Key Build Phase, where we will construct and deliver each component needed for a fully operational club. This phase includes:

Clubhouse:
A central facility designed to meet the needs of players, staff, and the local community. The clubhouse will offer modern amenities, meeting rooms, locker facilities, and a welcoming social space.


Two Rugby Pitches:
Professionally designed and constructed pitches tailored to regulation standards, allowing for practice and competitive matches year-round.

Car Park:
There are ample parking facilities to accommodate players, staff, and visitors, with accessibility features for all.

Landscaping:
Carefully planned landscaping to create an inviting and functional outdoor space, including spectator areas, pedestrian pathways, and natural elements to enhance the aesthetic and environmental integration of the site.

Our aim with the Sittingbourne Rugby Club project is to create a state-of-the-art rugby venue that fosters community engagement, promotes sports development, and is a lasting asset for the Sittingbourne area.

The Dargate Industrial Units project in Kent involved comprehensive enabling works and groundworks for developing 48 industrial units. Our scope covered complete site preparation, including utility setup, earthworks, and essential infrastructure installation.

Site Enabling and Groundworks:
Clearing, levelling, and preparing the entire site to provide a stable foundation.

Road Networks:
Construction of durable internal roads for efficient site accessibility and logistics.

Concrete Foundations & Floors:
Reinforced concrete foundations and power-floated floors were installed across all units, meeting high standards for industrial use.
This project delivers a thoroughly prepared and operational site built to support the region’s long-term industrial growth and sustainability.

This project was delivered as a full turn-key solution, covering every aspect from groundwork to final landscaping. Our scope included hard and soft landscaping and the installation of high-quality driveways designed for durability and aesthetic appeal. We undertook all necessary infrastructure works, including constructing and integrating pumping stations to support adequate site drainage. In addition, we carried out all foundation and substructure works, ensuring a stable and reliable base for future development. The project showcased our ability to manage and deliver comprehensive solutions, providing a seamless service from initial groundworks to project completion.

The Bower Farm project is a prime example of our full turn-key delivery approach, where we managed every build stage from concept to completion. Our scope of work included extensive groundwork, with the construction of foundations and substructures tailored to the specific site conditions. We also undertook the full infrastructure installation, including designing and integrating pumping stations to support the development’s utilities and drainage requirements. In addition to the core construction elements, we completed all hard and soft landscaping to create a finished, functional, and visually appealing external environment. This included driveways, pathways, planting schemes, and garden layouts to complement the new homes. By delivering a fully managed, ready-to-occupy solution, we ensured a streamlined process for the client, with high-quality standards, safety, and efficiency maintained throughout. Bower Farm is a testament to our commitment to delivering comprehensive, high-specification housing solutions.

Your Project, Our Expertise.

DDG Group delivers with precision, professionalism, and pride from breaking ground to completion and handover. Let’s bring your vision to life with a construction partner you can trust every step of the way.